A new method to solve weighted minimax single facility
location problem with Euclidean distance, with Anuj Davalbhakta: Accepted and in print;
International Journal of Industrial Engineering.
-
A CDS based two-phase
algorithm for group scheduling with group dependent setup times, with Advait Damle: Cellular Manufacturing Conference,
Columbus, Ohio, 2003.
-
A two-stage heuristic method for balancing mixed
model assembly lines with parallel work stations, with Neil Kanitkar: IIE Annual Research Conference,
Portland, Oregon, 2003.
-
Heuristic to minimize makespan in an
assembly job shop where machines process multiple parts and jobs use parts
from multiple machines,
with Amol Damle and Shivraj Jadhav; Proceedings:
IIE Annual Research Conference, Orlando, FL, May 2002
-
A new heuristic for placing absolute p-center on
a general graph, with Advait Damle,
Proceedings: IIE Annual Research Conference, Orlando, FL, May 2002
-
Fuzzy logic application in data acquisition, with Tory Watkins; Proceedings: ASME 2001 Design
Engineering Technical Conferences and Computers and Information, Pittsburgh,
2001
-
Evaluation of Fault Tree using Fuzzy Logic Analysis,
with Tory Watkins; Proceedings: IIE Annual Research Conference, Dallas, TX, May 2001
-
Plant Layout Designer: Software for Plant Layout
Development with Narsimhan Pallapalayam;
Proceedings: IIE Annual Research Conference, Dallas, TX, May 2001
-
Facility Planning, Invited presentation; V International Conference
on Manufacturing Systems, Queretaro, Mexico
-
, Sept 2000
-
Job Shop Scheduling with Parallel Processors; Industrial Engineering Research Conference, Phoenix,
AZ, May 1999
-
A Framework for training workers in Contemporary
Manufacturing Environments; International
Journal of Computer Integrated Manufacturing, Vol 12, No 4, 1999
-
Preventive Maintenance Scheduling in single machine
problem; Proceedings: International
Conference on Computers and Industrial Engineering, New Orleans, LA, March
1999
-
Heuristic procedure for Makespan minimization in
Hybrid Flow Shop; Journal of Computer
and Industrial Engineering, 1998
-
Scheduling Robots in confined work area for an Electronic
Assembly Operation; IIE Annual
Conference, Banff, 1998
-
Heuristic Procedure for Makespan minimization in
Job Shops with Multiple Identical Processors; Proceedings: 22nd ICC & IE Conference,
Cairo, Egypt
-
, 1997
-
Heuristic method to alleviate the bottleneck stage
and minimize the Makespan of a Hybrid Flow Shop with Penny Adams; Presented at IIE Research Conference,
1997
-
Distributor’s Pallet Loading problem; International Journal of Industrial Engineering,
Vol 1, 1994
-
Heuristic to minimize Throughput time on a NC machine;
International Journal of Industrial Engineering, Vol 1, 1994
-
Heuristic method for Single Machine Scheduling Problem;
International Journal of Industrial Engineering, Vol 1, 1994
-
Integrated Decision Models for Concurrent Engineering
with Kannan Venkatesh, Srinivasaraghavan Rajagopalan and Dulio Furtado;
Proceedings: Fourth International Conference on Technology, Mar 1994
-
Engineering Project Team Formation: A Similarity
Coefficient Approach with Srinivisaraghavan
Rajagopalan; Proceedings: Fourth International Conference on Management
of Technology, Mar 1994
-
Assessment, Transfer and Management of Technology
in Healthcare with Kenneth H.
Gardner; Proceedings: Fourth International Conference on Management of Technology,
Mar 1994
-
Job Sequencing to minimize Tool Changeovers in Flexible
Manufacturing; International Journal
of Production Planning and Control, Vol 4, No 1, 1993
-
Optional Robot Path Determination using Linear Programming
with Shukla and Furtado; Proceedings: 14th Annual Conference
on Computers and Industrial Engineering, 1992
-
A Heuristic Procedure for Component Scheduling in
Printed Circuit Pack Sequencer;
International Journal of Production Research, Vol 30, No 5, 1992
-
Manpower Assignment Strategies in Serial Lines with
Limited Personnel: Evaluation of Pull-Push rules with Wayne Norris; Computers and Industrial Engineering,
1992
-
A Present Value Approach to determine Optimum Project
Duration with Bruce Chow; Engineering
Economist, Vol 37, No 2, 1992
-
Batch Scheduling for Limited Capacity Fixed Period
Process problem with Sanjay Saxena;
Production Planning and Control, Vol 3, No 1, 1992
-
Computerized Facility Layout Design with Reza Ziai; Proceedings: Computers and Industrial
Engineering Conference, 1991
-
Machine Capacity Planning in Group Technology; International Journal of Production Research,
Vol 29, No 9, 1991
-
A generalized Reliability Block Diagram (RBD) simulation
with Kerry Figiel; Proceedings: Winter Simulation Conference, New Orleans,
1990